DCS Professional Island Vent Hood IVS52 Installation Guide

Browse online or download Installation Guide for Fireplaces DCS Professional Island Vent Hood IVS52. DCS Professional Island Vent Hood IVS52 Installation guide User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - Installation Guide

THE PROFESSIONAL ISLAND VENT HOODInstallation GuideMODELS:IVS40 C(_(_IVSS2

Page 2 - A MESSAGE TO OUR CUSTOMERS

HOOD INSTALLATION1. Adjust chimney mounting structure to E + 3/8" dimension as determined in installation heightcaHcuHation on page 7. Use 2 scre

Page 3 - TABLE OF CONTENTS

INSTALLATION3. Assembly of the lO"Transition.5.6.The transition supplied with the hood mounts to the topof the hood, Figure 5.a. PHacethe transit

Page 4 - CAUTION:

9,Ducfing: There should be no more than 1"gap between canopy transition and houseducting. Adjust starting coHHarover bothducts. Tighten coHHar.Fa

Page 5 - SAFETY PRACTICES&

INSTALLATIONSnap the centra[ baffJe tinter pane[ into the pJace so the both rainsengage with side pins on bothsides of hood. Drive 2 screws (1 on each

Page 6 - PARTS INCLUDED WITH YOUR HOOD

wmRmNGTO POWER SUPPLY/_ WARNING:Turn off power circuit at the service panel before wiring this unit.120 VAC, 15 Amp circuit required.1. Remove j-box c

Page 7 - BEFORE INSTALLING HOOD

FINAL ASSEMBLYFor final Chimney Cover installation, DO NOT USE ELECTRIC SCREW DRIVER.NOTE: Overtightening screws can deform metal.1. Hnsta[[the cage n

Page 8 - BEFOREiNSTALLiNG HOOD

INSTALLATION2.Install the two brackets to the chimney structure supplied with the kit by using one screw eachside.3. Join the two top sections of the

Page 9

8.9.Join the two bottom sections of the duct cover which covers the chimney structure using 6screws, (3 each side, see Fig. 17 for the phn diagram for

Page 10 - HOOD INSTALLATION

HOW TO OBTAIN SERVICEBEFORE YOU CALL FOR SERVICEI Is the circuit breaker tripped or the fuse bHown?[] Is there a _ower outage in the area?For warranty

Page 11 - INSTALLATION

LiMiTED WARRANTYWhen you purchase a new DCS Ventilation Product for persona[ or consumer use you automaticallyreceive a One year Limited Warranty, cov

Page 12 - From Control

A MESSAGE TO OUR CUSTOMERSThank you for selecting this DCS Professiona! Island Vent Hood. Because of this appfiance!s unique features wehave developed

Page 13

7.Noiseorvibrationthatisconsiderednormal,forexample,drain/fansounds,regenerationnoisesoruserwarningbeeps.8.Correctingdamagecausedbypests,forexample,ra

Page 15 - FINAL ASSEMBLY

A Fisher & Paykel Appliances, Inc CompanyFisher & Paykel Appliances, Inc.5900 Bkylab Road, Huntington Beach, CA 92647Customer Care: 888.28! .5

Page 16

A MESSAGE TO OUR CUSTOMERSFOR YOUR SAFETYIf You Smell Gas:t Do not try to light any appliance.t Do not touch any electrical switch; do not use any pho

Page 17

SAFETY PRACTICES AND PRECAUTIONSCAUTION:For general ventilating use only. Do not use to exhaust hazardous or explosivematerials or vapors.Z_ WARNING:T

Page 18 - HOW TO OBTAIN SERVICE

SAFETY PRACTICES&z_ WARNING:To reduce the risk of fire and to properly exhaust air, be sure to duct air tooutside. Do not vent exhaust air into sp

Page 19 - THiS WARRANTY DOES NOT COVER:

PARTS INCLUDED WITH YOUR HOODn Hood canopy assembly with light bulbs installed.n MetaH transition with back draft dampersm Use & Care/HnstaHHation

Page 20 - COMMERCIAL USE

BEFORE INSTALLING HOOD1. For the most efficient air flow exhaust, use a straight run or as few elbows as possible.CAUTION:Vent unit to outside of buil

Page 21

BEFOREiNSTALLiNG HOODTYPICAL INSTALLATIONA typka[ hood installation is shown below in Figure 1. When installed with the HVCKchimneyaccessory kit, the

Page 22 - Fax: 714.372.7003

BEFORE INSTALLING HOODCEILING PREPARATIONInstalling supports above ceiling drywall.NOTE: Take into consideration the hood depth; some models are much

Comments to this Manuals

No comments