DCS MEGA ARM Service Manual

Browse online or download Service Manual for Garden tools DCS MEGA ARM. DCS MEGA ARM Service manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 21
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
REV020603
CLASS 1,2,3,4
MODEL
MEGA SWING-ULTM
LISTED 4P92
COMMERCIAL DUTY SWING GATE OPERATOR
UL-325 LISTED
REV 6.34 OR HIGHER
INSTALLATION AND SERVICE MANUAL
IMPORTANT INSTALLATION INSTRUCTIONS-DO NOT DISCARD
(UL-325 MARCH 1, 2000 EDITION)
THIS IS A CLASS 1,2,3,4 SWING GATE OPERATOR.
FOR USE IN CLASS 1,2,3,4SWING GATE APPLICATIONS.
(IMPORTANT: READ AND UNDERSTAND WARRANTY PAGE FIRST)
THIS UNIT MUST ONLY BE INSTALLED BY AN EXPERIENCED TECHNICIAN
DISCONNECT AC POWER & BATTERIES BEFORE SERVICING.
WARNING
! CHILDREN SHOULD NEVER BE ALLOWED TO PLAY NEAR OR OPERATE AUTOMATIC GATES.
FAILURE TO: 1) OBSERVE SAFE OPERATING PROCEDURE, 2) TRAIN YOUR CUSTOMER PROPERLY OR
3) INSTALL PROPER WARNING SIGNAGE, MAY RESULT IN SERIOUS INJURY.
DC SOLUTIONS, INC
4750 S.W. 36 STREET. BLDG-X
FT. LAUDERDALE, FLORIDA 33314
(954)-327-0988
MEGA-ARM, MEGA-SWING-UL, MEGA-PULSE, MEGA-SENSE ARE TRADEMARKS OF DC SOLUTIONS, INC.
Page view 0
1 2 3 4 5 6 ... 20 21

Summary of Contents

Page 1 - MEGA SWING-ULTM

REV020603 CLASS 1,2,3,4 MODEL MEGA SWING-ULTM LISTED 4P92 COMMERCIAL DUTY SWING GATE OPERATOR UL-325 LISTED REV 6.

Page 2 - TABLE OF CONTENTS

DRIVE ARM CONFIGURATION MEGA SWING-ULCLOSINGPROPER ANGLE FOR DRIVE ARM INSTALLATION, DO NOT ALLOW ARM TO SCISSOR!BCADEELBOWELBOWGATE PLATEPADFG(PA

Page 3 - INSTALLATION CHECK-OFF LIST

NOTE 1: MAXIMUM AMBIENT TEMPERATURE FOR INSTALLATION, 140 F. NOTE 2: FOR AUTOMOTIVE USE ONLY, NO MOTORCYCLES, BICYCLES OR PEDESTRIANS. WIRING AND

Page 4 - SAFETY EDGES (CONTACT EDGE):

24 VOLTS DC (Continued) 7, BACK-AWAY (FOR BARRIER ARM GATE ONLY) This input is recommned for use with our Mega Arm barrier gates. For your Mega Sw

Page 5 - THIS DRAWING IS NOT TO SCALE

120 VAC POWER CONNECTION 120 VAC (BLACK)NEUTRALGROUND(GREEN)(WHITE)CONNECT 120 VAC TO THE 3 WIRES THAT COME OUT FROM THE BOTTOM OF THE DUPLEX OUTL

Page 6 - SAFETY RECOMMENDATIONS

TIMERS AND MODE SECTIONS-(S1 and S2) FULL SPEED RUN TIMER- SWITCH PACK S1 (1-5) SECONDS---------- 1 2 4 8 16

Page 7 - INTRODUCTION

ADJUSTMENTS RIGHT OR LEFT HAND OPERATION: UNIT SHIPS AS RIGHT-HAND Method 1: To change the direction of travel from a RIGHT to a LEFT HAND OPERAT

Page 8 - PRE-INSTALLATION NOTES!

RIGHT OR LEFT HAND OPERATION : METHOD 2 DIAGRAM NOTE: SWITCH S1-7 MUST BE OFF FOR METHOD #2 ACC. POWER BATTERY AC XFMR MOTOR+ _+ _S3-

Page 9 - INSTALLATION PROCEDURE

TROUBLE SHOOTING AND MAINTENANCE PROCEDURES WARNING - DISCONNECT BATTERIES AND AC POWER BEFORE SERVICING ANY MECHANICAL OR MOVING COMPONENTS!!

Page 10 - ADJUSTMENTS

SAMPLE CONFIGURATIONS SAFETYLOOPMEGA SWING-ULCARD READERTELE-ENTRYRADIO CONTROLDUAL D

Page 11 - 120 VAC

CONTROL BOARD LAYOUT BOARD REV 2.0 (2/98) READ SAFETY INSTRUCTIONS BEFORE WIRING J2 J3D13K-1 J1ACC. POWER

Page 12 - BATTERY INSTALLATION

TABLE OF CONTENTS INTRODUCTION INSTALLATION CHECK-OFF LIST... A1

Page 13 - SLAVE - J3

MEGA SWING-UL. PARTS LIST 1516REAR VIEWFRONT VIEWPCB1131018201910536897SIDE VIEW31223GEAR BOXFRAME6 ARM ENDS22A22B22C22D21A21B21C22E22F22F ITEM

Page 14 -

(You must read, understand and agree with all items in the limited warranty) INSTALLATION CHECK-OFF LIST MUST BE COMPLETED ANY REQUIRED CONTACT EDG

Page 15

INSTALLATION CHECK-OFF LIST THIS SWING GATE OPERATOR IS INSTALLED FOR USE AS A CLASS _____ INSTALLATION EACH ITEM ON THIS INSTALLATION CHECK-OFF LI

Page 16 - LEFT HAND OPERATION

WHAT TO EXPECT FROM OUR CLASS 1,2,3,4 OPERATOR. SAFETY INSTRUCTIONS REGARDING PRIMARY & SECONDARY ENTRAPMENT PROTECTION. THIS UNIT IS PROVIDE

Page 17 - GENERAL SERVICE

RECOMMENDED PHOTO-CELL LAYOUT FOR SECONDARY ENTRAPMENT PROTECTION PLEASE USE ALL SAFETY DEVICES ON YOUR INSTALLATION TO ACHIEVE THE SAFEST OPERAT

Page 18

SAFETY RECOMMENDATIONS Automatic gate operators can produce high levels of force, therefore it is very important that all gate operator system inst

Page 19 - CONTROL BOARD LAYOUT

INTRODUCTION UNIT OVERVIEW The DC SOLUTIONS model MEGA-SWING-UL swing gate operator is unique in the industry. Setting the MEGA-SWING-UL apart a

Page 20 - MEGA SWING-UL. PARTS LIST

PRE-INSTALLATION NOTES! NOTE: BEFORE ATTEMPTING ANY PART OF THE INSTALLATION, YOU MUST READ THE ENTIRE INSTRUCTION MANUAL FIRST AND AGREE TO T

Page 21 - LIMITED WARRANTY

INSTALLATION PROCEDURE CONCRETE PAD The concrete pad for operator mounting should be approximately 24"deep x24"wide x26"long i

Comments to this Manuals

No comments