REV020603 CLASS 1,2,3,4 MODEL MEGA SWING-ULTM LISTED 4P92 COMMERCIAL DUTY SWING GATE OPERATOR UL-325 LISTED REV 6.
DRIVE ARM CONFIGURATION MEGA SWING-ULCLOSINGPROPER ANGLE FOR DRIVE ARM INSTALLATION, DO NOT ALLOW ARM TO SCISSOR!BCADEELBOWELBOWGATE PLATEPADFG(PA
NOTE 1: MAXIMUM AMBIENT TEMPERATURE FOR INSTALLATION, 140 F. NOTE 2: FOR AUTOMOTIVE USE ONLY, NO MOTORCYCLES, BICYCLES OR PEDESTRIANS. WIRING AND
24 VOLTS DC (Continued) 7, BACK-AWAY (FOR BARRIER ARM GATE ONLY) This input is recommned for use with our Mega Arm barrier gates. For your Mega Sw
120 VAC POWER CONNECTION 120 VAC (BLACK)NEUTRALGROUND(GREEN)(WHITE)CONNECT 120 VAC TO THE 3 WIRES THAT COME OUT FROM THE BOTTOM OF THE DUPLEX OUTL
TIMERS AND MODE SECTIONS-(S1 and S2) FULL SPEED RUN TIMER- SWITCH PACK S1 (1-5) SECONDS---------- 1 2 4 8 16
ADJUSTMENTS RIGHT OR LEFT HAND OPERATION: UNIT SHIPS AS RIGHT-HAND Method 1: To change the direction of travel from a RIGHT to a LEFT HAND OPERAT
RIGHT OR LEFT HAND OPERATION : METHOD 2 DIAGRAM NOTE: SWITCH S1-7 MUST BE OFF FOR METHOD #2 ACC. POWER BATTERY AC XFMR MOTOR+ _+ _S3-
TROUBLE SHOOTING AND MAINTENANCE PROCEDURES WARNING - DISCONNECT BATTERIES AND AC POWER BEFORE SERVICING ANY MECHANICAL OR MOVING COMPONENTS!!
SAMPLE CONFIGURATIONS SAFETYLOOPMEGA SWING-ULCARD READERTELE-ENTRYRADIO CONTROLDUAL D
CONTROL BOARD LAYOUT BOARD REV 2.0 (2/98) READ SAFETY INSTRUCTIONS BEFORE WIRING J2 J3D13K-1 J1ACC. POWER
TABLE OF CONTENTS INTRODUCTION INSTALLATION CHECK-OFF LIST... A1
MEGA SWING-UL. PARTS LIST 1516REAR VIEWFRONT VIEWPCB1131018201910536897SIDE VIEW31223GEAR BOXFRAME6 ARM ENDS22A22B22C22D21A21B21C22E22F22F ITEM
(You must read, understand and agree with all items in the limited warranty) INSTALLATION CHECK-OFF LIST MUST BE COMPLETED ANY REQUIRED CONTACT EDG
INSTALLATION CHECK-OFF LIST THIS SWING GATE OPERATOR IS INSTALLED FOR USE AS A CLASS _____ INSTALLATION EACH ITEM ON THIS INSTALLATION CHECK-OFF LI
WHAT TO EXPECT FROM OUR CLASS 1,2,3,4 OPERATOR. SAFETY INSTRUCTIONS REGARDING PRIMARY & SECONDARY ENTRAPMENT PROTECTION. THIS UNIT IS PROVIDE
RECOMMENDED PHOTO-CELL LAYOUT FOR SECONDARY ENTRAPMENT PROTECTION PLEASE USE ALL SAFETY DEVICES ON YOUR INSTALLATION TO ACHIEVE THE SAFEST OPERAT
SAFETY RECOMMENDATIONS Automatic gate operators can produce high levels of force, therefore it is very important that all gate operator system inst
INTRODUCTION UNIT OVERVIEW The DC SOLUTIONS model MEGA-SWING-UL swing gate operator is unique in the industry. Setting the MEGA-SWING-UL apart a
PRE-INSTALLATION NOTES! NOTE: BEFORE ATTEMPTING ANY PART OF THE INSTALLATION, YOU MUST READ THE ENTIRE INSTRUCTION MANUAL FIRST AND AGREE TO T
INSTALLATION PROCEDURE CONCRETE PAD The concrete pad for operator mounting should be approximately 24"deep x24"wide x26"long i
Comments to this Manuals