CABINET PREPARATION
6. Cut the openings for the following installation:
Standard counter top installation, see Fig. 6A
Deep counter or island installation, see Fig. 6B
NOTE:
The sides or bottom of the opening may be solid combustible or non-combustible material. If the bottom is solid,
provide a 6” x 6” cutout in the left rear corner for the gas inlet and power cord clearance. See Fig. 4.
Fig. 3
Flush with cabinets
Front projects outward as shown
from standard depth cabinet.
Front flush with cabinets; a minimum
of 25
3/4"
cabinet depth required
Front flush with cabinets; a minimum of 26-1/2”
cabinet depth required
Front projects outward as shown
from standard depth cabinet.
Flush with cabinets
Fig. 4
6”
6”
Cutout